Power Transformer
Hebei Youge supplies oil-immersed power transformers from 6.3 MVA to 63 MVA at 33kV, 35kV, and higher, serving utility substations, power plants, industrial intakes, and renewable grid connection. Units are built to IEC 60076 with IEEE C57 options, offered with NLTC or OLTC tap changers, and delivered with full routine test reports within 30 days of drawing approval.
Showing 25–36 of 37 results
- Power Transformer
40 MVA 66kV/11kV Three-Phase Oil-Immersed Power Transformer
- Power Transformer
4000 kVA 33kV Three-Phase Oil-Immersed Power Transformer
- Power Transformer
40000 kVA 35kV Three-Phase Oil-Immersed Power Transformer
- Power Transformer
5000 kVA 33kV Three-Phase Oil-Immersed Power Transformer
- Power Transformer
5000 kVA 33kV/11kV Step-Down Three-Phase Power Transformer
- Power Transformer
63 MVA 110kV/11kV Three-Phase Oil-Immersed Power Transformer
- Power Transformer
63 MVA 132kV/11kV Three-Phase Oil-Immersed Power Transformer
- Power Transformer
6300 kVA 33kV Three-Phase Oil-Immersed Power Transformer
- Power Transformer
8000 kVA 33kV Three-Phase Oil-Immersed Power Transformer




